top of page

AIR CRANE SERVICES


Rooftop Unit Placement

Antenna and Tower Erecting

Steel Erecting

Powerline Construction, Inspection and Maintenance

Lighting & Signage Placement

Ski-Lift Construction

Aircraft & Boat Salvage – Recovery

Wildfire Suppression

Internal Cargo Transport

Disaster Response Teams

Placement of Erosion Control Materials

Dust Collectors, Stacks, & Power Plants

TIME LAPSE TRIP

  • BUILDING HEIGHT 300’

  • DISTANCE/REACH 450’

  • TIME ON JOB = 90 MINUTES

  • 31 LIFTS

Aerial Crane versus Land Crane 
Comparison Chart
helicopter-transport_edited.png

HELICOPTER

Less expensive - saves up to 65%

Saves time - on the job for 80% to 90% less in total

 

 

 

Lifts to 25,000 pounds with unlimited reach (100’s of miles if necessary) 

LAND CRANE

 

More expensive - incurs extra set up fees, labor costs, infrastructure damage and road closures all which drive up the price

 

 

Takes more time - set up & breakdown can take days, as well as extra equipment

 

 

 

100’s of tons BUT requires tons of equipment and days to assemble

crane1
crane1
Truck - flatbed_edited.png
Truck - flatbed_edited.png
Truck - flatbed_edited.png
IMG_1741.jpg
Since 1978

YOUR AERIAL CRANE SPECIALISTS

Spanning the entire country, the 5 State Helicopter national network services clients and their lifts throughout the United States.

  • Facebook - Grey Circle
5State-logo-black.png
bottom of page